Runway and taxiway upgrade.

CLIENT: North Yorkshire County Council    VALUE: £300,000     COMPLETION: November 2021      

DURATION: 2 years   CONTRACT: BAE bespoke Design and Build

WORKS INCLUDED

  • Tarmac patching to runways and taxiways
  • Line markings
  • Reconstructed areas
  • 12000m of Reflective crack repairs using a flexible polymerised bitumen
  • 10,000m2 Slurry Sealing
  • Upgrade to the site entrance road including surfacing, lighting and drainage

KEY RISKS/CHALLENGES

  • Work had to be coordinated with air traffic control to work around incoming and outgoing flights  
  • Foreign bodies getting blown/sucked into aircraft engines
  • High water table which restricted the work during winter months and high tides
  • High levels of site security

LESSONS IMPLEMENTED

  • Robots were used to Premark lines

COLLABORATION AND VALUE ADDED

  • Some items of work had to carried out at night or at the weekend

PLANNING AND PROGRAMME

  • Works completed on schedule