Pinch Points

Phase one was resurfacing of Ullswater Road roundabout together with widening of approach roads.

Phase two was converting two 3 way junctions into separate roundabouts at the Gilwilly Industrial Estate entrances off Newton Road.

CLIENT: Cumbria County Council    VALUE: £1.5m     COMPLETION: Summer 2015     

DURATION: 21 weeks    CONTRACT: NEC 3 Option B

WORKS INCLUDED

  • Extensive traffic and pedestrian management was designed by Thomas Armstrong (Construction) Ltd to allow traffic flow without disruption to the M6 via a temporary contraflow system
  • Hot Rolled Asphalt with a modified binder and precoated chippings
  • Extensive service diversions coordinated entirely by Thomas Armstrong (Construction) Ltd