CLIENT: Cumbria County Council     VALUE: £275,000     COMPLETION: September 2014     

DURATION: 30 weeks     CONTRACT: NEC Option A

WORKS INCLUDED

  • Thomas Armstrong (Construction) Ltd obtained the Flood Defence Consent from the Environment Agency (EA).
  • Extensive consultation over the design with the National Park and the Environment Agency
  • Challenging site due to the steepness of the existing slope
  • Temporary access road was constructed

  • Pollution control measures were put in place to prevent spillages into the river.
  • SSSI site with regard to Geology on the site. Geollogist employed to oversee excavation in the rock
  • Rock anchors drilled through the foundation into the existing bedrock
  • Stone faced walling in keeping with the surrounding area